News classification
- Glass fiber reinforced plastic products
- Anticorrosion construction of glass fiber reinforced plastics
- Glass fibre reinforced plastic tile
- Glass steel cooling tower
- Glass fiber reinforced plastic fan
- Glass fibre reinforced plastic chimney
- frp grating
- Toughened glass tank
- Glass fiber reinforced plastic water tank
- 0
- Glass fiber reinforced plastic pipe
- Glass fiber reinforced plastic mortar pipe
- Glass fiber reinforced plastic water tank
- Glass fiber reinforced plastic storage tank
- Integrated prefabricated pumping station
- FRP cover plate
- FRP manufacturer
Contact us
- Add: Suzhou, Changzhou, Wuxi, Shanghai FRP anti-corrosion products
- Tel: 【加微信时须说明您的单位名称和手机号码】
- Fax: 131-9671-3587(推销勿扰。不接同行业务)
- Email: 主要为长三角地区提供玻璃钢防腐制品定制
Glass fiber reinforced plastic water tank mounting method
Jiangsu glass steel tank factory (Suzhou Wuxi glass steel tank, glass steel tank, Changzhou FRP tank, Nantong FRP tank) Shanghai Shandong Taicang Kunshan glass steel tank, Zhangjiagang Changshu Jiangyin Yixing Zhenjiang Xuzhou Suqian Yancheng Lianyungang Huaian Nanjing glass steel tank
1, the installation of the box and the wall between the provision of not less than 800mm of the access channel, the top of the box, the bottom is not less than 500mm;
2, the civil construction of the first concrete bar foundation;
3, the assembly should close the outlet pipe and drain pipe, open the inlet pipe, filled with water after 24 hours without leakage of water for qualified;
4, the construction site to provide construction power and check the seal water.
Installation and commissioning matters needing attention:
The foundation of the water tank can be made of concrete beam, or i-beam. Ventilation air filtering device is arranged on the top of the water tank. Inside the water tank are used reinforcement. Each pipe flange is 1.0MPa standard flange.
2, the civil construction of the first concrete bar foundation;
3, the assembly should close the outlet pipe and drain pipe, open the inlet pipe, filled with water after 24 hours without leakage of water for qualified;
4, the construction site to provide construction power and check the seal water.
Installation and commissioning matters needing attention:
The foundation of the water tank can be made of concrete beam, or i-beam. Ventilation air filtering device is arranged on the top of the water tank. Inside the water tank are used reinforcement. Each pipe flange is 1.0MPa standard flange.