Product categories
- Glass fiber reinforced plastic storage tank
- 0
- 0
- Anticorrosion construction of glass fiber reinforced plastics
- Glass fiber reinforced plastic pipe
- 0
- 0
- 0
- frp grating
- Jiangsu glass fiber reinforced plastic corrosion protection engineering company
- 0
- diaosu
- 0
- 0
- Integrated prefabricated pumping station
- FRP manufacturers
Contact us
- Add: Suzhou, Changzhou, Wuxi, Shanghai FRP anti-corrosion products
- Tel: 【加微信时须说明您的单位名称和手机号码】
- Fax: 131-9671-3587(推销勿扰。不接同行业务)
- Email: 主要为长三角地区提供玻璃钢防腐制品定制
Product show
Glass steel mist purification tower body
Product Numbers:201722012335
Price:US $
Product introduction:Jiangsu mist purification tower factory (Suzhou mist purification tower, Wuxi tower, Changzhou fog mist purification purification tower, Nantong mist purification tower) Shanghai waste gas purification tower, acid mist absorber, g
Glass steel mist purification tower body:
(1) composite glass steel storage tank, a liquid feeding pipe, the suction tube and the filtrate device inlet section using composite glass steel.
(2) the first and two stage spray section by a row of Y-1 nylon nozzle, Paul ring filter and organic glass peep hole.
(3) the effective water retaining section is provided with a water retaining effect of swirl plate increase.
(4) glass steel hood cover.
(5) F4-72 glass fiber reinforced plastic centrifugal fan
(6) plastic water pump or stainless steel centrifugal pump.
(7) other fittings, such as plastic pipe fittings, valves, fixed supports, maintenance ladders and air ducts. Glass steel mist purification tower body
Glass steel mist purification tower installation and precautions:
1, the equipment should be installed on the ground above the surface of the concrete above 100mm, pumps, fans should be required to do the concrete foundation.
2, transport installation should pay attention to the protection, not to damage the body and parts.
3, the equipment factory, the company in accordance with the specific circumstances, the use of sub packaging and transportation, the company sent to the scene to install and debug.
4, the installation and operation of the equipment in the outdoor, the bottom of the pool in winter to pay attention to antifreeze.
5, the equipment at the bottom of the pool has a liquid level marking, before use must be marked by the liquid into the absorption liquid. Should pay attention to the use of the process of absorption liquid.
6, the use of the first time to open the circulating water pump for 2-3 minutes, and then start the blower, stop when the blower should be stopped for 1-2 minutes, then stop circulating water pump.
7, should be based on the use of regular inspection of the bottom of the tower body liquid acid depth and exhaust gas purification degree, more than the standard should be replaced in the bottom of the pool water absorption.
8, the equipment a year and a half to two years to do a check, check the disk spray tube and filler packing, and its cleaning. Glass steel mist purification tower body
(1) composite glass steel storage tank, a liquid feeding pipe, the suction tube and the filtrate device inlet section using composite glass steel.
(2) the first and two stage spray section by a row of Y-1 nylon nozzle, Paul ring filter and organic glass peep hole.
(3) the effective water retaining section is provided with a water retaining effect of swirl plate increase.
(4) glass steel hood cover.
(5) F4-72 glass fiber reinforced plastic centrifugal fan
(6) plastic water pump or stainless steel centrifugal pump.
(7) other fittings, such as plastic pipe fittings, valves, fixed supports, maintenance ladders and air ducts. Glass steel mist purification tower body
Glass steel mist purification tower installation and precautions:
1, the equipment should be installed on the ground above the surface of the concrete above 100mm, pumps, fans should be required to do the concrete foundation.
2, transport installation should pay attention to the protection, not to damage the body and parts.
3, the equipment factory, the company in accordance with the specific circumstances, the use of sub packaging and transportation, the company sent to the scene to install and debug.
4, the installation and operation of the equipment in the outdoor, the bottom of the pool in winter to pay attention to antifreeze.
5, the equipment at the bottom of the pool has a liquid level marking, before use must be marked by the liquid into the absorption liquid. Should pay attention to the use of the process of absorption liquid.
6, the use of the first time to open the circulating water pump for 2-3 minutes, and then start the blower, stop when the blower should be stopped for 1-2 minutes, then stop circulating water pump.
7, should be based on the use of regular inspection of the bottom of the tower body liquid acid depth and exhaust gas purification degree, more than the standard should be replaced in the bottom of the pool water absorption.
8, the equipment a year and a half to two years to do a check, check the disk spray tube and filler packing, and its cleaning. Glass steel mist purification tower body