Product categories
- Glass fiber reinforced plastic storage tank
- 0
- 0
- Anticorrosion construction of glass fiber reinforced plastics
- Glass fiber reinforced plastic pipe
- 0
- 0
- 0
- frp grating
- Jiangsu glass fiber reinforced plastic corrosion protection engineering company
- 0
- diaosu
- 0
- 0
- Integrated prefabricated pumping station
- FRP manufacturers
Contact us
- Add: Suzhou, Changzhou, Wuxi, Shanghai FRP anti-corrosion products
- Tel: 【加微信时须说明您的单位名称和手机号码】
- Fax: 131-9671-3587(推销勿扰。不接同行业务)
- Email: 主要为长三角地区提供玻璃钢防腐制品定制
Product show
Pay attention to what installation of FRP septic tank
Product Numbers:2017220122952
Price:US $
Product introduction:Jiangsu glass factory (Suzhou glass steel septic tank septic tanks, Wuxi glass steel septic tanks, Changzhou glass steel septic tanks, Nantong glass steel septic tanks) Shanghai FRP tanks, FRP pipe, glass steel purification tower,
After understanding the purchase of glass reinforced plastic septic tank should pay attention to this matter, we need to look after the glass steel septic tank served site we need to do the work, and in the process, we need to pay attention to those things, Xiaobian together and we talk about the following installation of FRP septic tank matters needing attention:
Pay attention to what installation of FRP septic tank
1 septic tanks and transported to the site, before installation with FRP septic tank inspection, whether they need models, check whether there is damage to the seepage.
2 septic tank hoisting to check whether the correct direction of import and export.
3 check whether the pit depth of the site is in line with the design requirements of the project.
4 check the inlet and outlet interface size to meet the requirements.
5 glass steel septic tanks should be carried out after half of irrigation backfill, check whether the back filling compacting backfill, achieve the standard check at the top of the septic tank is the water from the glass steel septic tank 30-40cm. Pay attention to what installation of FRP septic tank
Pay attention to what installation of FRP septic tank
1 septic tanks and transported to the site, before installation with FRP septic tank inspection, whether they need models, check whether there is damage to the seepage.
2 septic tank hoisting to check whether the correct direction of import and export.
3 check whether the pit depth of the site is in line with the design requirements of the project.
4 check the inlet and outlet interface size to meet the requirements.
5 glass steel septic tanks should be carried out after half of irrigation backfill, check whether the back filling compacting backfill, achieve the standard check at the top of the septic tank is the water from the glass steel septic tank 30-40cm. Pay attention to what installation of FRP septic tank