Product categories
- Glass fiber reinforced plastic storage tank
- 0
- 0
- Anticorrosion construction of glass fiber reinforced plastics
- Glass fiber reinforced plastic pipe
- 0
- 0
- 0
- frp grating
- Jiangsu glass fiber reinforced plastic corrosion protection engineering company
- 0
- diaosu
- 0
- 0
- Integrated prefabricated pumping station
- FRP manufacturers
Contact us
- Add: Suzhou, Changzhou, Wuxi, Shanghai FRP anti-corrosion products
- Tel: 【加微信时须说明您的单位名称和手机号码】
- Fax: 131-9671-3587(推销勿扰。不接同行业务)
- Email: 主要为长三角地区提供玻璃钢防腐制品定制
Product show
Integrated prefabricated pumping station
Product Numbers:20173343437
Price:Integrated prefabricated pumping station
Product introduction:Jiangsu station (Suzhou factory integrated prefabricated integrated prefabricated pumping station pumping station / Changzhou / Wuxi integrated prefabricated integrated prefabricated pumping station integrated prefabricated pumpin
Integrated prefabricated pumping station is to improve the sewage, rain water, drinking water, waste water lifting equipment, unified production and assembly of the factory to be transported to the site after the installation of key pumping station.
1.1 integrated prefabricated pumping station
The utility model is composed of a top cover, a glass fiber reinforced plastic (GRP) cylinder body, a base, a submersible pump, a service platform, a pipeline, etc., and the utility model is used to meet the requirements of pressurization and lifting drainage requirements
1.2 top Top cap
Glass fiber reinforced plastic cover and open pump cover plate.
1.3 cylinder Cylinder
The shaft part of the prefabricated pumping station.
1.4 base Lampstand
Connected to the concrete floor to fix the part of the prefabricated pump.
1.5 mechanical and electrical equipment Mechanical and electrical equipment
The mechanical and electrical equipment of the integrated prefabricated pumping station mainly includes the water pump and its auxiliary equipment, the pollution prevention and cleaning equipment, the pressure pipeline, the valve equipment, the control system, etc..
1.6 automatic coupling system Auto coupling
Submersible pump and fixed pipeline interface between the fast loading system called automatic coupling system.
1.7 approach Get into site
The integration of the prefabricated pumping station into the construction site or other designated place of landing and complete acceptance, transfer, delivery of temporary custody.
1.8 installation and commissioning Installation and adjustment
Construction and assembly drawings and related technical standards in accordance with the requirements of the installation, integration of prefabricated pumping station has been installed on the basis of entry or facilities on the regulations, complete leveling stability, mechanical assembly connection, and electrical wiring and equipment test, setting and testing, in situ and simulated operation test of centralized control process, the integration of prefabricated pumping station to test operation conditions.
Integral prefabricated pumping station
2.1 cylinder
The 2.1.1 cover shall be made of glass fiber reinforced plastic cover and open pump cover plate. The cover material can be made of lightweight materials such as glass fiber reinforced plastic or aluminum alloy.
2.1.2 cover inside and outside surface should be flat, there shall be no crack depth more than 2mm, there shall be no delamination, fiber, resin, naked nodule inclusion, the color was foreign body uneven.
2.1.3 glass fiber reinforced plastic (GRP) cylinder material shall be composed of anti-corrosion layer, anti permeability layer, structure layer and outer protective layer, and the thickness of each layer is shown in the figure. The outer protective layer shall be provided with anti ultraviolet material to prevent the aging under the sunlight.
2.1.4 overall cover should be anti slip measures. The antiskid cover can be made of glass fiber.
2.1.5 production of aluminum alloy cover plate should be non slip pattern plate, tensile strength should be 120MPa and above, the thickness of the plate should be 5mm and above (excluding the pattern). The cover flange shall be not less than 20mm.
2.1.6 cylinder with E-glass fiber roving and its products as reinforcing material and thermosetting resin as matrix, glass steel pipe winding process made by computer, uniform thickness. The hardness should reach 40HBa and above, the compressive strength should reach 120MPa and above, the hoop tensile strength 150MPa, the axial tensile strength 60MPa.
The inner lining layer of the 2.1.7 includes the inner layer and the inner surface layer, the total thickness is not less than 2mm, and the inner surface thickness is not less than 0.3mm. The minimum thickness of the pipe wall shall not be less than the nominal thickness specified in the drawings and technical documents approved by the prescribed procedures.
2.1.8 cylinder body shall be fitted with at least two external lugs.
2.2 base
2.2.1 should be the base structure base concave arc, the inner side of the pedestal can be designed according to the reserved or install mixer, crushing grille.
The tensile strength of the 2.2.2 base shall be 120MPa and above, and the hardness of the 40HBa shall be up to.
The peripheral skirt 2.2.3 base should be at least 2 drilled grouting holes, grouting hole diameter should reach DN100 and above.
The lower part of the base 2.2.4 should be concrete anti floating, on the basis of anti floating calculation to determine the design size of concrete slab, multi shaft pumping station and pumping station before and after the end should adopt the same floor structures, concrete strength grade cement floor should not be less than C40 diameter shall be not less than 10mm, the thickness should be not less than 250mm, shall be embedded in concrete floor anchor bolt for hoisting prefabricated pumping station into the pit after fixed. The concrete floor can be prefabricated, or can be directly poured into the foundation pit.
The weight of the base station 2.2.5 should be more than 1.5 times the total weight of the water pump, water pump to prevent the fixed junction vibration and resonance. Selection of shockproof component for dry pump station according to pump form.
2.3 service platform and automatic coupling system
2.3.1 integrated prefabricated pump station should be set up service platform.
2.3.2 service platform should be made of aluminum alloy or glass fiber reinforced plastic materials, service platform shall not be less than 450kg.
2.3.3 automatic coupling system in normal use shall not leak, and should be conducive to the lifting of the pump.
2.4 control cabinet
The size of the 2.4.1 control cabinet shall be in accordance with the provisions of GB/T3047.1 of the height of the 20mm, the basic dimensions of the panels, racks and cabinets.
The surface of 2.4.2 control cabinet should be smooth and well proportioned, and the welding place should be even and firm, and there should be no obvious distortion or burn through.
Electrical and electronic components in the 2.4.3 control cabinet shall comply with the relevant product standards.
The connection points of the 2.4.4 control cabinet should be firm, wiring shall comply with relevant standards and design drawings.
The color of the wire and bus in the 2.4.5 control cabinet shall comply with the relevant standards.
The color of the 2.4.6 indicator and button shall comply with the relevant standards.
At the bottom of the cabinet body 2.4.7 control cabinet shall be provided with a mounting hole of the fixed base.
The top 2.4.8 control cabinet should have the rings, so that the hoisting.
The protection level of 2.4.9 control cabinet shall be in accordance with the provisions of the current national standard "GB4208".
2.4.10 control cabinet should be equipped with a variety of intelligent sensors, unmanned, programming and remote control can be achieved.
2.4.11 control panel display function should be consistent with
1.1 integrated prefabricated pumping station
The utility model is composed of a top cover, a glass fiber reinforced plastic (GRP) cylinder body, a base, a submersible pump, a service platform, a pipeline, etc., and the utility model is used to meet the requirements of pressurization and lifting drainage requirements
1.2 top Top cap
Glass fiber reinforced plastic cover and open pump cover plate.
1.3 cylinder Cylinder
The shaft part of the prefabricated pumping station.
1.4 base Lampstand
Connected to the concrete floor to fix the part of the prefabricated pump.
1.5 mechanical and electrical equipment Mechanical and electrical equipment
The mechanical and electrical equipment of the integrated prefabricated pumping station mainly includes the water pump and its auxiliary equipment, the pollution prevention and cleaning equipment, the pressure pipeline, the valve equipment, the control system, etc..
1.6 automatic coupling system Auto coupling
Submersible pump and fixed pipeline interface between the fast loading system called automatic coupling system.
1.7 approach Get into site
The integration of the prefabricated pumping station into the construction site or other designated place of landing and complete acceptance, transfer, delivery of temporary custody.
1.8 installation and commissioning Installation and adjustment
Construction and assembly drawings and related technical standards in accordance with the requirements of the installation, integration of prefabricated pumping station has been installed on the basis of entry or facilities on the regulations, complete leveling stability, mechanical assembly connection, and electrical wiring and equipment test, setting and testing, in situ and simulated operation test of centralized control process, the integration of prefabricated pumping station to test operation conditions.
Integral prefabricated pumping station
2.1 cylinder
The 2.1.1 cover shall be made of glass fiber reinforced plastic cover and open pump cover plate. The cover material can be made of lightweight materials such as glass fiber reinforced plastic or aluminum alloy.
2.1.2 cover inside and outside surface should be flat, there shall be no crack depth more than 2mm, there shall be no delamination, fiber, resin, naked nodule inclusion, the color was foreign body uneven.
2.1.3 glass fiber reinforced plastic (GRP) cylinder material shall be composed of anti-corrosion layer, anti permeability layer, structure layer and outer protective layer, and the thickness of each layer is shown in the figure. The outer protective layer shall be provided with anti ultraviolet material to prevent the aging under the sunlight.
2.1.4 overall cover should be anti slip measures. The antiskid cover can be made of glass fiber.
2.1.5 production of aluminum alloy cover plate should be non slip pattern plate, tensile strength should be 120MPa and above, the thickness of the plate should be 5mm and above (excluding the pattern). The cover flange shall be not less than 20mm.
2.1.6 cylinder with E-glass fiber roving and its products as reinforcing material and thermosetting resin as matrix, glass steel pipe winding process made by computer, uniform thickness. The hardness should reach 40HBa and above, the compressive strength should reach 120MPa and above, the hoop tensile strength 150MPa, the axial tensile strength 60MPa.
The inner lining layer of the 2.1.7 includes the inner layer and the inner surface layer, the total thickness is not less than 2mm, and the inner surface thickness is not less than 0.3mm. The minimum thickness of the pipe wall shall not be less than the nominal thickness specified in the drawings and technical documents approved by the prescribed procedures.
2.1.8 cylinder body shall be fitted with at least two external lugs.
2.2 base
2.2.1 should be the base structure base concave arc, the inner side of the pedestal can be designed according to the reserved or install mixer, crushing grille.
The tensile strength of the 2.2.2 base shall be 120MPa and above, and the hardness of the 40HBa shall be up to.
The peripheral skirt 2.2.3 base should be at least 2 drilled grouting holes, grouting hole diameter should reach DN100 and above.
The lower part of the base 2.2.4 should be concrete anti floating, on the basis of anti floating calculation to determine the design size of concrete slab, multi shaft pumping station and pumping station before and after the end should adopt the same floor structures, concrete strength grade cement floor should not be less than C40 diameter shall be not less than 10mm, the thickness should be not less than 250mm, shall be embedded in concrete floor anchor bolt for hoisting prefabricated pumping station into the pit after fixed. The concrete floor can be prefabricated, or can be directly poured into the foundation pit.
The weight of the base station 2.2.5 should be more than 1.5 times the total weight of the water pump, water pump to prevent the fixed junction vibration and resonance. Selection of shockproof component for dry pump station according to pump form.
2.3 service platform and automatic coupling system
2.3.1 integrated prefabricated pump station should be set up service platform.
2.3.2 service platform should be made of aluminum alloy or glass fiber reinforced plastic materials, service platform shall not be less than 450kg.
2.3.3 automatic coupling system in normal use shall not leak, and should be conducive to the lifting of the pump.
2.4 control cabinet
The size of the 2.4.1 control cabinet shall be in accordance with the provisions of GB/T3047.1 of the height of the 20mm, the basic dimensions of the panels, racks and cabinets.
The surface of 2.4.2 control cabinet should be smooth and well proportioned, and the welding place should be even and firm, and there should be no obvious distortion or burn through.
Electrical and electronic components in the 2.4.3 control cabinet shall comply with the relevant product standards.
The connection points of the 2.4.4 control cabinet should be firm, wiring shall comply with relevant standards and design drawings.
The color of the wire and bus in the 2.4.5 control cabinet shall comply with the relevant standards.
The color of the 2.4.6 indicator and button shall comply with the relevant standards.
At the bottom of the cabinet body 2.4.7 control cabinet shall be provided with a mounting hole of the fixed base.
The top 2.4.8 control cabinet should have the rings, so that the hoisting.
The protection level of 2.4.9 control cabinet shall be in accordance with the provisions of the current national standard "GB4208".
2.4.10 control cabinet should be equipped with a variety of intelligent sensors, unmanned, programming and remote control can be achieved.
2.4.11 control panel display function should be consistent with
PREVIOUS:FRP sculpture
NEXT:Overview of integrated prefabricated pum