Product categories
- Glass fiber reinforced plastic storage tank
- 0
- 0
- Anticorrosion construction of glass fiber reinforced plastics
- Glass fiber reinforced plastic pipe
- 0
- 0
- 0
- frp grating
- Jiangsu glass fiber reinforced plastic corrosion protection engineering company
- 0
- diaosu
- 0
- 0
- Integrated prefabricated pumping station
- FRP manufacturers
Contact us
- Add: Suzhou, Changzhou, Wuxi, Shanghai FRP anti-corrosion products
- Tel: 【加微信时须说明您的单位名称和手机号码】
- Fax: 131-9671-3587(推销勿扰。不接同行业务)
- Email: 主要为长三角地区提供玻璃钢防腐制品定制
Product show
Construction safety management of glass fiber reinforced plastic desulfurization tower
Product Numbers:20173412052
Price:Glass fiber reinforced plastic desulfurization tow
Product introduction:Jiangsu glass steel desulfurization tower manufacturers (Suzhou glass steel desulfurization tower, Wuxi glass steel desulfurization tower, Changzhou glass steel desulfurization tower, Nantong glass steel desulfurization tower) Sha
The ordinary resin composite material has poor temperature resistance, and is not suitable for the main material of the dust removing tower. Due to the use of the resin composite corrosion resistant materials, and has carried on the modification of high temperature resistance, and dust removing tower body used wound molding equipment, greatly increasing the strength of equipment, the SCT series of dedusting and desulphurization tower with a high strength, corrosion resistance and other properties, in normal operating conditions maintenance rate is almost zero. Construction safety management of glass fiber reinforced plastic desulfurization tower
The construction of the desulfurization tower engineering process of glass steel, anti-corrosion lining needs a lot of absorption tower wall, rubber lining construction is used in flammable materials, if there are omissions, it may cause fire. In the absorption tower lining after the construction, the fire safety of the absorption tower or not effect, because of the absorption tower and the internal equipment installation, and the absorption tower adjacent equipment installation process, are likely to cause a fire, let's learn about fire prevention knowledge:
Fire prevention measures for construction of anticorrosive rubber lining of 1 absorption tower
Strengthen safety management
Construction area of full closed isolation
Equipped with fire hose and fire fighting equipment from the absorption tower near the fire pipe, always in standby condition, equipped with fire engines. Adequate fire fighting equipment and water must be provided in the absorption tower and flue.
The rubber lining construction use explosion-proof electrical absorption tower lighting must be 24V explosion-proof lamp, the power wires must use the new soft rubber cable, power supply control switch must be explosion-proof type, should be set up in the absorption tower or flue outside.
The absorption tower all around the forbidden hot plugging openings,
The absorption tower tower ventilation ventilation fan capacity should be set enough to ensure good ventilation, absorption tower.
The absorption tower to reduce fuel loads with rubber and glue rubber lining work, how and how much to take, the general control of about 5 kegs, can't be piled.
Fire training, the establishment of the fire brigade before the construction of the lining of the rubber, the Ministry of construction of the project to organize a full fire training and drills, focusing on the use of fire fighting equipment and personnel escape exercise. Set up an active fire brigade.
2 absorption tower fire prevention measures after construction of the rubber lining in the absorption tower lining after the construction, the fire safety of the absorption tower or not effect, because of the absorption tower and the internal equipment installation, and the absorption tower adjacent equipment installation process, are likely to cause fire, if the fire caused by internal equipment such as absorption tower mist, spray and other flammable layer combustion equipment, the whole project will be disastrous. Therefore, in the absorption tower until the end of 168 hours before the transfer, must be strictly fire prevention work. Construction safety management of glass fiber reinforced plastic desulfurization tower
The construction of the desulfurization tower engineering process of glass steel, anti-corrosion lining needs a lot of absorption tower wall, rubber lining construction is used in flammable materials, if there are omissions, it may cause fire. In the absorption tower lining after the construction, the fire safety of the absorption tower or not effect, because of the absorption tower and the internal equipment installation, and the absorption tower adjacent equipment installation process, are likely to cause a fire, let's learn about fire prevention knowledge:
Fire prevention measures for construction of anticorrosive rubber lining of 1 absorption tower
Strengthen safety management
Construction area of full closed isolation
Equipped with fire hose and fire fighting equipment from the absorption tower near the fire pipe, always in standby condition, equipped with fire engines. Adequate fire fighting equipment and water must be provided in the absorption tower and flue.
The rubber lining construction use explosion-proof electrical absorption tower lighting must be 24V explosion-proof lamp, the power wires must use the new soft rubber cable, power supply control switch must be explosion-proof type, should be set up in the absorption tower or flue outside.
The absorption tower all around the forbidden hot plugging openings,
The absorption tower tower ventilation ventilation fan capacity should be set enough to ensure good ventilation, absorption tower.
The absorption tower to reduce fuel loads with rubber and glue rubber lining work, how and how much to take, the general control of about 5 kegs, can't be piled.
Fire training, the establishment of the fire brigade before the construction of the lining of the rubber, the Ministry of construction of the project to organize a full fire training and drills, focusing on the use of fire fighting equipment and personnel escape exercise. Set up an active fire brigade.
2 absorption tower fire prevention measures after construction of the rubber lining in the absorption tower lining after the construction, the fire safety of the absorption tower or not effect, because of the absorption tower and the internal equipment installation, and the absorption tower adjacent equipment installation process, are likely to cause fire, if the fire caused by internal equipment such as absorption tower mist, spray and other flammable layer combustion equipment, the whole project will be disastrous. Therefore, in the absorption tower until the end of 168 hours before the transfer, must be strictly fire prevention work. Construction safety management of glass fiber reinforced plastic desulfurization tower