Product categories
- Glass fiber reinforced plastic storage tank
- 0
- 0
- Anticorrosion construction of glass fiber reinforced plastics
- Glass fiber reinforced plastic pipe
- 0
- 0
- 0
- frp grating
- Jiangsu glass fiber reinforced plastic corrosion protection engineering company
- 0
- diaosu
- 0
- 0
- Integrated prefabricated pumping station
- FRP manufacturers
Contact us
- Add: Suzhou, Changzhou, Wuxi, Shanghai FRP anti-corrosion products
- Tel: 【加微信时须说明您的单位名称和手机号码】
- Fax: 131-9671-3587(推销勿扰。不接同行业务)
- Email: 主要为长三角地区提供玻璃钢防腐制品定制
Product show
Requirements for installation of FRP desulphurization tower in installation
Product Numbers:2017610125535
Price:FRP desulphurization tower
Product introduction:Jiangsu glass fiber reinforced plastic corrosion protection and glass fiber reinforced plastic factory. Suzhou Wuxi Changzhou Nantong Shanghai waste gas treatment equipment (mist purification tower, exhaust gas purification tower)
Glass steel desulfurization tower is a desulfurization equipment used in various industries, the products can be used in chemical industry, metallurgical industry, power industry and other industries, gas for the purification of ammonia (NH3), sulfuric acid mist (H2SO4), chromium acid (CrO3), hydrogen cyanide (HCN) gas and other harmful gases has been widely used. Then, FRP desulphurization tower in the installation needs to follow what requirements? Following [Huaqiang] Xiaobian to brief introduction:
1 glass steel desulfurization tower ensure tower block assembled in diameter, especially the glass steel factory desulfurization tower on tower diameter error outlet should be as small as possible.
2, tower block assembled, glass steel desulfurization tower should pay attention to the arc surface of the tower body gasket rib arc jointing, shell assembly should ensure water tightness
, 3 power supply should have safety measures, power line connected, junction box should be taken about sealing measures to prevent moisture into the burn, caring.
4, the water pipe direction according to the actual situation of the scene, adjusted by changing the direction of the screw holes on the flange.
5, should be installed into the ventilation fan tip clearance, and the tower should be uniform is not greater than 100mm, 4 leaves should be adjusted at the same angle, and to ensure that the rotation of the impeller plane and the vertical center line.
6 glass steel desulfurization tower for packing layer arranged with smooth surface and uniform spacing.
7, and ensure the column under the water inlet pipe and a good foundation, foundation of embedded steel, glass steel desulfurization tower installation surface profiles and to ensure that in the same water, and the water inlet pipe column under vertical axis based surface.
8, selection of circulating water pump, should pay attention to the flow and cooling water with glass steel desulfurization tower should be maintained in the cooling tower design volume + 5% range, with waterproof volume, cooling effect.
1 glass steel desulfurization tower ensure tower block assembled in diameter, especially the glass steel factory desulfurization tower on tower diameter error outlet should be as small as possible.
2, tower block assembled, glass steel desulfurization tower should pay attention to the arc surface of the tower body gasket rib arc jointing, shell assembly should ensure water tightness
, 3 power supply should have safety measures, power line connected, junction box should be taken about sealing measures to prevent moisture into the burn, caring.
4, the water pipe direction according to the actual situation of the scene, adjusted by changing the direction of the screw holes on the flange.
5, should be installed into the ventilation fan tip clearance, and the tower should be uniform is not greater than 100mm, 4 leaves should be adjusted at the same angle, and to ensure that the rotation of the impeller plane and the vertical center line.
6 glass steel desulfurization tower for packing layer arranged with smooth surface and uniform spacing.
7, and ensure the column under the water inlet pipe and a good foundation, foundation of embedded steel, glass steel desulfurization tower installation surface profiles and to ensure that in the same water, and the water inlet pipe column under vertical axis based surface.
8, selection of circulating water pump, should pay attention to the flow and cooling water with glass steel desulfurization tower should be maintained in the cooling tower design volume + 5% range, with waterproof volume, cooling effect.