Product categories
- Glass fiber reinforced plastic storage tank
- 0
- 0
- Anticorrosion construction of glass fiber reinforced plastics
- Glass fiber reinforced plastic pipe
- 0
- 0
- 0
- frp grating
- Jiangsu glass fiber reinforced plastic corrosion protection engineering company
- 0
- diaosu
- 0
- 0
- Integrated prefabricated pumping station
- FRP manufacturers
Contact us
- Add: Suzhou, Changzhou, Wuxi, Shanghai FRP anti-corrosion products
- Tel: 【加微信时须说明您的单位名称和手机号码】
- Fax: 131-9671-3587(推销勿扰。不接同行业务)
- Email: 主要为长三角地区提供玻璃钢防腐制品定制
Product show
Epoxy floor construction
Product Numbers:2017727174549
Price:Epoxy floor construction
Product introduction:Jiangsu glass fiber reinforced plastic factory! Construction of epoxy floor in Nantong, Wuxi, Changzhou and Suzhou! Shanghai glass steel anti-corrosion engineering construction, FRP tanks, FRP pipe, waste gas treatment equipment (
1, side production side construction, construction environment should have enough isolation area, lest dust, sand and other infiltration of wet paint, epoxy floor.
2, vulnerable areas, more conspicuous "window" parts, corridors should be used daily cloth mop clean 1--2 times.
3, the ground if there is coarse sand, mud should be promptly cleaned, so as not to sand milling ground, reducing ground wear.
4, the staff into the clean area, should change soft bottom shoes; in easy to often into the sand, mud of the junction, the entrance and set up plastic carpet, convenient for staff access, cleaning soles sundry.
5, fork lift, forklift loading and unloading, pay attention to flat cargo, to avoid side drop, drag and drop, scratch the ground.
6, vehicles, forklifts, forklifts, running as far as possible to avoid sudden braking.
7, often oil spill parts, with sawdust often clean, so as to avoid oil denaturation, adsorption dust, become stubborn stains. A large area of oil immersion, you can use a wide cloth mop, push sawdust to dry floor oil.
8, repair tools to avoid falling to the ground.
9, if there is a big film damage, should be promptly repaired, in order to oil infiltration before the foundation repair operations. When water is washed in the workshop, the mixture of oil and water is prevented from being deposited at the depth of damage.
2, vulnerable areas, more conspicuous "window" parts, corridors should be used daily cloth mop clean 1--2 times.
3, the ground if there is coarse sand, mud should be promptly cleaned, so as not to sand milling ground, reducing ground wear.
4, the staff into the clean area, should change soft bottom shoes; in easy to often into the sand, mud of the junction, the entrance and set up plastic carpet, convenient for staff access, cleaning soles sundry.
5, fork lift, forklift loading and unloading, pay attention to flat cargo, to avoid side drop, drag and drop, scratch the ground.
6, vehicles, forklifts, forklifts, running as far as possible to avoid sudden braking.
7, often oil spill parts, with sawdust often clean, so as to avoid oil denaturation, adsorption dust, become stubborn stains. A large area of oil immersion, you can use a wide cloth mop, push sawdust to dry floor oil.
8, repair tools to avoid falling to the ground.
9, if there is a big film damage, should be promptly repaired, in order to oil infiltration before the foundation repair operations. When water is washed in the workshop, the mixture of oil and water is prevented from being deposited at the depth of damage.